PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core Drilling for Conduit Facing West (800x600).jpg Damaged foundation wall at column line K-2.5 Facing West (800x600).jpg Excavation for foundation walls along column line 6.5 from G-C.7 Facing South (800x600).jpg Instaling metal decking at Derrick -2 Facing North-West (800x600).jpg Installing metal decking at Derrick -2 Facing West (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing North (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing West (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3 3rd Floor Facing West (800x600).jpg Laying out the foundation walls at column line 6.5 From G-C.7 Facing East (800x600).jpg
Previous pageNext page Installing metal decking at Derrick -2 Facing West (800x600)
Installing metal decking at Derrick -2 Facing West (800x600)